Figure 5-20 Connecting a nitrogen cylinder (2)
Step 4 Stop the nitrogen cylinder and wait for 20 minutes.
Step 5 Start the nitrogen cylinder and repeat
----End

5.9 Checking After Commissioning

Table 5-6
Table 5-6 Commissioning checklist
Check Item
The needle valve plug is secured (torque of 0.45±0.05
N·m), and valve bonnet is tightened.
The foreign matter inside the water pan and bottom plate
is cleaned up.
The air filter is correctly installed according to the airflow
direction marked on the frame.
Check that the chilled water valve is closed.
All external cables are neatly routed and clearly labeled.
All T/H sensors have no fault alarms and the mapping is
correct.
All fans rotate in the correct direction without abnormal
noise.
Issue 01 (2022-12-30)
NO TE
When using high-pressure nitrogen to drain water, prevent the remaining water in the
water pan from splashing.
lists the commissioning checklist.
Copyright © Huawei Digital Power Technologies Co., Ltd.
5 Power-On Commissioning
Step 2–Step 3
for three times.
Actual Result
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed