5.1 Preparing for Power-On

Procedure
Step 1 Check that the upstream power input switch for the smart cooling product is OFF.
Step 2 Check that the QF1 and QF2 switches are OFF.
Step 3 Check that the AC/DC auxiliary power module, main control module and fan drive
module are inserted properly and the latches are locked.
Step 4 Check that the system is properly grounded.
Step 5 Verify that the input voltage meets the requirement.
Step 6 Verify that the indoor unit power cable is connected properly.
Step 7 If teamwork networking is required, verify that the teamwork cable is correctly
connected.
Step 8 Verify that the cable connections and DIP switch settings of the T/H sensors are
correct.
----End

5.2 Powering On the Unit

Procedure
Step 1 Turn on the general switch. For a unit that has two power inputs, turn on the
active power switch QF1 and standby power switch QF2. Turn on the upstream
switch.
Step 2 After the initial power-on, the Quick Settings screen is displayed. Log in as user
admin, as shown in
Issue 01 (2022-12-30)
5

Power-On Commissioning

Figure
Copyright © Huawei Digital Power Technologies Co., Ltd.
5-1.
5 Power-On Commissioning
76

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fusioncol8000-c210h4

Table of Contents