FusionCol8000-C210 In-room Chilled Water Smart
Cooling Product
User Manual (2022, Netherland GS)
Contents
4.3.3 Exhausting Nitrogen......................................................................................................................................................... 43
4.3.4 (Optional) Combining Units.......................................................................................................................................... 44
4.3.5 Securing a Unit................................................................................................................................................................... 45
4.3.6 Connecting Air Ducts........................................................................................................................................................46
4.4 Connecting Pipelines............................................................................................................................................................ 47
4.4.1 Connecting a Drainpipe................................................................................................................................................... 47
4.4.4 Injecting Water to Expel Gas......................................................................................................................................... 52
4.4.5 Leakage Test with Water................................................................................................................................................ 52
4.5 Installing Cables.................................................................................................................................................................... 53
4.5.1 Precautions.......................................................................................................................................................................... 53
4.5.3 Connecting Power Cables............................................................................................................................................... 54
4.5.4 Connecting Signal Cables............................................................................................................................................... 55
4.6.1 Preparing a Network Cable............................................................................................................................................58
4.6.2 FE Teamwork + FE Monitoring..................................................................................................................................... 59
4.13 Verifying the Installation................................................................................................................................................. 73
5 Power-On Commissioning................................................................................................... 76
5.1 Preparing for Power-On......................................................................................................................................................76
5.2 Powering On the Unit......................................................................................................................................................... 76
5.3 Home Screen.......................................................................................................................................................................... 83
5.4 Initial Configuration............................................................................................................................................................. 85
Issue 01 (2022-12-30)
Copyright © Huawei Digital Power Technologies Co., Ltd.
v