Fujitsu AIRSTAGE UTY-ALGX Instruction Manual page 196

System controller lite for vrf system
Table of Contents

Advertisement

There are the following methods of setting the exceptional day and pattern. Select the appropriate method.
Set a specific day. Select the month/day from the Day/Month specification area and set the pattern.
Day selection contents: Every, 1 to 31
Month selection contents: Every, 1,2,3,4,5,6,7,8,9,10,11,12
Set from month week/month/day of week. Combine from the "Month Week/Month/Day" specification
area and set the pattern.
Month Week selection contents: 1st, 2nd, 3rd, 4th, 5th
Month selection contents: Every, 1,2,3,4,5,6,7,8,9,10,11,12
Day selection contents: Every, Sun, Mon, Tue, Wed, Thu, Fri, Sat
5
Set from the week number and day of week. Combine from the Year Week/Day specification area and
set the pattern. This is displayed only when a calendar starting from Monday is set
Year Week selection contents: 1 to 53 (Select the week number from the beginning of the year.)
Day selection contents: Every, Sun, Mon, Tue, Wed, Thu, Fri, Sat
At the end of setting, click the [Apply] button.
The contents set with , ,
To cancel a setting, click the [Cancel] button.
The Exceptional Day Setting screen is closed without reflecting the contents in the settings made with
and .
, ,
5
When setting is complete, click the [OK] button.
The contents in the settings made with , ,
and the Exceptional Day Setting screen is closed
To delete an exceptional day setting displayed in the exceptional day list, select the exceptional day to
be deleted and click the [Delete] button. That exceptional day is deleted from the list.
Changing the exceptional day list priority order
Select the exceptional day whose priority is to be changed and change it to the desired priority by
clicking the [Move Up] or [Move Down] button.
"Priority order" is the order of the exceptional days applied by giving priority to the exceptional day with
the lowest number when the days set during multiple setting overlap.
If the [OK] button or[ Apply] button is not clicked after the order was changed, the change will not be
reflected.
Copyright© 2013-2015 Fujitsu General Limited. All rights reserved.
and
are reflected in the exceptional day list.
5
and
5
196
are also reflected in the exceptional day list

Advertisement

Table of Contents
loading

Table of Contents