4.
Materials To Be Prepared Beforehand
Materials necessary at installation
●
WIBU-KEY (packed together with product)
●
WIBU-KEY for option (product packing)
●
U10 USB Network Interface (adaptor with connection to VRF network work finished)
●
Administrator ID and password (arbitrarily decided by the user)
●
System Controller Lite setup DVD (For details, see the next page.)
When number of USB ports for WIBU-KEY and U10 USB Network Interface use
is insufficient
●
USB hub
In the case of remote connection
(server PC continuously connected to local LAN)
●
IP address for connection to server PC
In the case of remote connection
(server PC continuously connected to internet)
●
Server PC fixed IP address, or Host name when dynamic DNS used.
●
Confirmation of opening to internet of ports used by System Controller Lite (port No:9983, 9984)
*
When unknown, please contact the network administrator.
In the case of remote connection (dial-up)
●
Telephone number for connection to server PC
When starting electricity charge apportionment data acquisition
●
Group apportionment contents of tenant blocks
●
Electricity charge contract information
When making settings which send e-mail notification when an error occurs
●
E-mail address (sender, receiver)
●
SMTP server name
Copyright© 2013-2015 Fujitsu General Limited. All rights reserved.
25