Husqvarna DXR 95 Operator's Manual page 40

Table of Contents

Advertisement

Available languages

Available languages

3. First operate the caterpillar tracks slowly and then
more quickly.
4. Move the arm system slowly in all directions. Make
sure that there is no load on the arm system.
5. Navigate to the product status on the remote control
to do a check of the temperature of the hydraulic oil.
Refer to
"Machine status" menu on page 50 . The
optimal work temperatures are between 40°C/104°F
and 55°C/131°F.
6. If the temperature is not correct, do the procedure
again.
To install and remove the caterpillar
track wideners (DXR 275, DXR 305,
DXR 315)
The caterpillar track wideners make the product more
stable.
1. Start the product. Refer to
275, DXR 305, DXR 315) on page 72 .
2. Put the product on a stable surface.
3. Extend the outriggers. Refer to
outriggers on page 83 .
4. Stop the product. Refer to
275, DXR 305, DXR 315) on page 84 .
5. Do the procedure that follows on each caterpillar
track.
a) Loosen the 4 screws (A) and (B) for the
caterpillar track widener.
D
b) Push the plate (C) to the side.
c) Pull the caterpillar track (D) out until it stops.
40
To start the product (DXR
To operate the
To stop the product (DXR
A
B
C
d) Make sure that the distance between the
caterpillar track and product is sufficient for the
caterpillar track widener. If it is necessary, loosen
the 2 screws (B) some more. Pull the caterpillar
track (D) out until it stops.
e) Install the caterpillar track widener. The holes on
the caterpillar track widener must point at the
product.
f) Push the caterpillar track (E) against the product.
g) Tighten the 2 M10 screws (F) and the 2 M24
screws (G) for the caterpillar track widener.
Torque the M10 screws to 47 Nm and the M24
screws to 500 Nm.
6. Remove the caterpillar track wideners in the
opposite sequence.
E
F
G
1401 - 005 - 11.01.2024

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dxr 145Dxr 275Dxr 305Dxr 315

Table of Contents