7. Commissioning

7.1. Required qualification

Commissioning, parameter adjustments and functional tests must be
carried out only by qualified commissioning personnel that have been
certified by ABB.

7.2. Commissioning procedure

Information on the commissioning procedure and the start conditions for
commissioning can be obtained from ABB.

7.3. Commissioning checklist

In order to ensure uncomplicated and speedy commissioning, it is
important that drive and associated equipment are ready for
commissioning. Reviewing and completing the items in the
commissioning checklist before the commissioning personnel arrive on
site will help to achieve this.

7.4. Customer assistance

During the commissioning period, the customer is requested to provide
qualified personnel for assistance, who are:
Experienced with medium and low voltage equipment and with the
local safety regulations,
Familiar with the driven process
Authorized to operate associated medium and low voltage equipment
(eg, input circuit breaker, other low and medium voltage switchgear)
Authorized to operate the driven process for functional tests

7.5. Customer acceptance

When commissioning has been completed, the commissioning report is
signed by the responsible commissioning personnel and by the customer
as a sign of acceptance. A copy of the report and a copy of the actual
parameter settings are handed out to the customer.
PRODUCT
ACS5000W
DOCUMENT KIND
User manual
DOCUMENT ID.
3BHS799208 E01
COMMISSIONING
REV.
LANG.
PAGE
F
en
113/178

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents