5. Route the cables along the pre-installed white cable brackets and through the
designated openings (1) into the front of the cable duct.
Use cable binders to fix the cables to the cable brackets.

Figure 5-6 Cable duct openings (example with 1700 mm PCU)

6. In the cable duct at the front, connect the cables according to "Appendix D -
Wiring diagrams".