6.7.1.3. Preparing cables for cable entries with sealing modules
Prepare cables with an outer cable screen or shield for EMC bonding with the metal
enclosure of the cabinet as illustrated.
1
2
3
4
5
6
Figure 6-15 Preparing power cables for sealing modules
1) Sealing module
2) Frame
3) Conductive foil of sealing module
4) Cable clamp
5) Shrinkable sheath seal
6) Heat-shrinkable termination
7) Outer cable sheath
Install the sealing modules according to the instructions of the sealing module
supplier.
PRODUCT
ACS5000W
7
8
9
10
11
DOCUMENT KIND
User manual
12
8) Cable sheath removed to expose cable
shield
9) Shield extension to be connected to PG
busbar
10) Cable screen extension to be connected to
the PG busbar
11) Cable lug as specified by the cable supplier
and suitable for M12 bolt
12) Sheath seal
DOCUMENT ID.
3BHS799208 E01
ELECTRICAL INSTALLATION
REV.
LANG.
PAGE
F
en
101/178