NetCol8000-A(050, 100) In-room Air Cooled Smart
Cooling Product
User Manual
3.4 Installing an Indoor Unit ............................................................................................................................................. 37
3.4.1 Installing Supports ................................................................................................................................................... 37
3.4.2 Lowing an Indoor Fan ............................................................................................................................................. 39
3.5 Connecting Pipelines .................................................................................................................................................. 47
3.5.1 Exhausting Nitrogen ................................................................................................................................................ 47
3.5.3 Routing Refrigerant Pipes ........................................................................................................................................ 51
3.5.4 Connecting Water Pipes ........................................................................................................................................... 54
3.5.5 Charge Nitrogen ....................................................................................................................................................... 56
3.6 Electric Cable Connections ......................................................................................................................................... 58
3.6.5 Connecting Signal Cables ........................................................................................................................................ 63
3.8 Installation Verification ............................................................................................................................................... 73
4 Power-On Commissioning ........................................................................................................ 76
4.1 Commissioning Preparations ...................................................................................................................................... 76
4.2.2 Vacuumization ......................................................................................................................................................... 77
4.3 Commissioning ........................................................................................................................................................... 83
4.3.1 Circuit Breakers ....................................................................................................................................................... 83
4.3.2 Commissioning Procedure ....................................................................................................................................... 84
4.4 Check After the Commissioning ................................................................................................................................. 85
5 ACC Introduction ........................................................................................................................ 86
5.1 Home Screen ............................................................................................................................................................... 86
5.2 Menu Hierarchy .......................................................................................................................................................... 87
5.3 Quick Settings ............................................................................................................................................................. 89
5.4 Initial Configuration ................................................................................................................................................... 89
Issue 10 (2019-01-15)
Copyright © Huawei Technologies Co., Ltd.
Contents
vi