2-4-1

Check List

Table 2-7
Schedule at least 3 hours for installation of the system.
Notify installation team of the existence of any variances from the basic installation.
Make sure system and probes have been subject to acclimation period.
Environmental cooling is sufficient.
Lighting is adjustable to adapt to varying operational conditions of the scanner.
Electrical facilities meet system requirements.
EMI precautions have been taken and all possible sources of interference have been
removed.
Mandatory site requirements have been met.
If a network is used, IP address has been set for the system and a dedicated network
outlet is available.
2-12
1
EVISION
Vivid i n/ Vivid q N Pre-Installation Check List
Section 2-4 - Connectivity Installation Worksheet
Action
V
V
N S
IVID I N AND
IVID Q
Yes
M
ERVICE
ANUAL
No