Steering Linkage Adjustments - Toro GreensPro 1200 Service Manual

Hide thumbs Also See for GreensPro 1200:
Table of Contents

Advertisement

Steering Linkage Adjustments

(Figures 6 through 13.)
1. Park machine on a clean, level surface with the
transport wheels in the raised and locked position.
Make sure engine is OFF. Remove spark plug wire
from spark plug.
2. Using a suitable lifting device, raise and support the
machine to allow steering linkage adjustment.
3
2
1
3. Insert a block (2) between steering pivot assembly
(3) and chassis frame (1) to prevent steering pivot
assembly (3) from moving during adjustment, and to
position steering pivot assembly (3) square with
chassis frame (1). Block should be approximately 1 in.
(25.4 mm) thick.
NOTE: Each of the steering linkage assemblies
includes a linkage rod, two ball joints, and two hex nuts.
To allow adjustment, one of the linkage rod ends has
left-hand threads, so one ball joint and hex nut also
have left-hand threads. Before attempting to loosen a
hex nut for linkage disassembly, inspect the visible
threads on the linkage rod to determine thread
direction.
Chassis
Figure 6
4. Loosen jam nuts (5) and turn steering pivot rod (4)
to achieve a distance of 21.06 in. (535 mm) between
centers of ball joints (6). Do not tighten jam nuts until
final step of steering linkage adjustments procedure.
8
7
Page 5 - 8
5
5
4
6
Figure 7
7
9
Figure 8
GreensPro 1200

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents