19
Figure 31
7. Install Woodruff key (20) into slot of upper steering
shaft (19).
19
17
Figure 32
8. Install upper steering shaft (19) into universal joint
(17), and tighten cap screw (23).
9. Slide bearing assembly (21) onto upper steering
shaft (19).
10. Tighten two socket-head set screws (22), securing
bearing assembly (21) to upper steering shaft (19).
24
10
Figure 33
11. Attach steering column (24) to roller chassis (10)
with four cap screws (25), flat washers (26), and lock
nuts (27).
GreensPro 1200
20
21
22
23
25 26 27
28 29 30
Page 5 - 17
12. Install two cap screws (28), flat washers (29), and
lock nuts (30) to front of steering column (24).
19
Figure 34
NOTE: Do not tighten the socket-head set screws on
the upper bearing assembly (31) until the final height
adjustment has been made.
13. Install upper bearing assembly (31) onto upper
steering shaft (19).
19
40
33 34 35
31
39
24
Figure 35
NOTE: Tightening the cap screws (35) will draw the
upper bearing assembly (31) into the opening (32) on
the top of the steering column box (40).
14. Guide upper steering shaft (19) through opening
(32) in the top of steering column box (40) when
installing steering column box (40) on steering column
(24). Install four cap screws (36), flat washers (37), and
lock nuts (38).
15. Install two cap screws (33), flat washers (34), and
lock nuts (35).
16. Tighten bearing socket-head set screws (39),
securing the upper bearing assembly (31) to upper
steering shaft (19).
17. Lubricate universal joint (17) with grease.