Toro GreensPro 1200 Service Manual page 60

Hide thumbs Also See for GreensPro 1200:
Table of Contents

Advertisement

Installation
(Figures 26 through 36.)
1
6
Figure 26
1. Install lower flange (5) and bearing (1) onto steering
pivot assembly (2), to achieve an approximate distance
of 3.13 in. (7.95 mm) (6) from bottom of steering pivot
assembly (2).
2. Install upper flange (3) onto steering pivot assembly
(2), and tighten two socket-head set screws (4).
7 8 9
Figure 27
3. Install steering pivot assembly (2), two cap screws
(7), four flat washers (8), and two lock nuts (9) to
chassis (10). Make sure that beveled corners of pivot
assembly are oriented toward front of machine.
Chassis
2
3
4
5
4. Attach steering pivot rod (11) to steering pivot
assembly (2) with cap screw (12), plated washer (13),
flat washer (14), and lock nut (15).
5. Install Woodruff key (16) into slot on steering pivot
assembly (2).
2
10
6. Install universal joint (17) on steering pivot assembly
(2), and tighten cap screw (18).
Page 5 - 16
2
12 13 14
Figure 28
2
Figure 29
17
Figure 30
11
15
16
18
2
GreensPro 1200

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents