Toro GreensPro 1200 Service Manual page 74

Hide thumbs Also See for GreensPro 1200:
Table of Contents

Advertisement

Disassembly
(Figure 66.)
1
2
9
10
4
5
3
4
5
1. Bearing assembly (2 used)
2. Collar (2 used)
3. Cap screw (6 used)
4. Lock washer (6 used)
1. Loosen set screws (9), and remove bearing
assemblies (1).
2. Measure and record distance from the face of each
collar (2) to the face on the flange of roller axles (6 and
8) to ensure correct installation.
3. Loosen socket-head set screws (10), and remove
collars (2).
4. Remove three cap screws (3), lock washers (4), and
flat washers (5), and remove roller axles (6 and 8).
Chassis
3
4
5
6
5. Flat washer (6 used)
6. Keyed roller axle
7. Drive roller
8. Roller axle
7
Figure 66
9. Set screw (2 used)
10. Socket-head set screw (2 used)
Assembly
(Refer to Figure 66.)
1. Install roller axles (6 and 8) using three cap screws
(3), lock washers (4), and flat washers (5).
2. Install collars (2), positioning each of them the same
distance from the roller axle flange as recorded during
removal. Tighten socket-head set screws (10).
3. Install bearing assemblies (1), and tighten (but do
not overtighten) set screws (9). Bearing assemblies
may need to be repositioned after drive roller assembly
has been installed in machine.
Page 5 - 30
5
4
8
2
5
4
10
3
5
4
GreensPro 1200
3
1
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents