Cabinet Installation Considerations - Toshiba strata CT Installation & Maintenance Manual

Digital business telephone system
Hide thumbs Also See for strata CT:
Table of Contents

Advertisement

Cabinet Installation Considerations

Recommended Installation Sequence
H
1.
Install power supplies in cabinets.
2.
Mount cabinets on wall or floor.
C
3.
Install earth wiring.
4.
Install AC power cabling to cabinets.
5.
Install reserve power cabling.
6.
Install PCBs and PCB cabling.
Strata CT I&M Manual October 2000
The Base (CHSUB672) and Expansion (CHSUE672) Cabinets can be wall or floor mounted.
To make it easier to add cabinets (after the initial installation) when a customer needs to
expand, install the Base Cabinet on top for wall-mount installations and on the bottom for
floor-mount installations.
The dimensions of the Base and Expansion Cabinets are:
Height: Base Cabinet: 11 3/4 inches
Height: Expansion Cabinet/Remote Expansion Cabinet: 10 inches
Width: 26 1/2 inches
Depth: 10 5/8 inches
Weight: approx. 30.5 lbs. (14 kg.)
Note
The weight approximates a cabinet completely filled with PCBs. Weight may vary
slightly, depending on PCBs.
Step
Note
Each cabinet requires four wood screws (#12X 1.25 inch size) for wall mount
installation. Wood screws are not provided with the system.
Reference Information
"Install Power Supply" on Page
"Wall Mounting the Base (Top) Cabinet" on
Page
2-9.
"Cabinet Floor Mounting" on Page
"Earth the System" on Page
"Install AC Power Components" on Page
"Install Reserve Power" on Page
Figures
2-24~2-30,
2-35
and the section titled
"Install Universal and Processor PCBs"
2-35.
Strata CT Installation
2-6.
2-26.
2-17.
2-18.
2-22.
on
Page
2-5

Advertisement

Table of Contents
loading

Table of Contents