Installation; Multiple Serial Port Installation - Toshiba strata CT Installation & Maintenance Manual

Digital business telephone system
Hide thumbs Also See for strata CT:
Table of Contents

Advertisement

ACD Installation

Installation

ACD for the Strata CT systems is provided through a feature key upgrade called RKYS. The
RKYS is a subassembly that attaches to the common control unit to provide the system with
optional features. See the
instructions.

Multiple Serial Port Installation

Remote Maintenance, MIS for ACD, and SMDI
With CT, the RSIU PCBs can be installed alone or in addition to PIOU/PIOUS to provide:
N
N
N
N
Related Programs
H
Program 03 (Codes 41, 42, and 43): Assigns PIOU and PIOU interface options. SMDR, page
outputs, SMDR, relay controls, alarm sensor, and door lock functions on PIOU or PIOUS
will be active on the installed PIOU/PIOUS that is programmed with the lowest Program 03
code (41, 42, or 43).
N
N
C
N
N
N
Notes
For more information on installation of the PIOU/PIOUS and the RSIU, see
Universal Slot PCB Wiring
7-2
"RKYS Feature Key Upgrades" on Page 2-38
Maintenance Terminal (or modem) interface
Management Information System (MIS) for ACD interface
SMDI
SMDR
Code 41: Enables Remote Maintenance.
Code 42: Enables MIS/SMIS PIOU or PIOUS Slot. The TTY port must have Code 42
set for its slot in Program 03 to support ACD/MIS.
Code 43: Enables RS-232 Voice Mail Interface/SMDI.
If the RSIU is to be used for ACD/MIS, the RSIU must be installed in the Strata DK
Base Cabinet, slot 11 and programmed with Code 49 in Program 03.
Program 76-1x3: Assigns the RSIU or RSIS port to provide MIS for ACD.
Program 76 assignments override Code 42 if programmed for PIOU or PIOUS in
G
Program 03.
and
Chapter 6 – Peripheral
Installation.
Strata CT I&M Manual October 2000
for installation
Chapter 4 –

Advertisement

Table of Contents
loading

Table of Contents