3.3 Unpacking the Chassis

The following tools must be available before the operation:
l
l
l
Procedure
Step 1 Check whether the package and seals are in good condition.
Step 2 Use a box cutter to cut the pressure-sensitive adhesive tape on the package, and open the
package.
Exercise caution when using a box cutter to avoid personal injury or equipment damage.
Step 3 Check the components against
oxidation, corrosion, and damage.
Table 3-2 Packing items
No.
1
2
3
----End

3.4 Installing the Server

This topic describes how to install a server on L-shaped guide rails, adjustable guide rails, and
holding rails. Choose an installation method based on site conditions.
Install a server if:
l
Issue 26 (2018-11-19)
Air filters installed on cabinet doors.
AC power supplied from the rear of the cabinet.
Protective gloves
ESD gloves or ESD wrist strap
Box cutter
NOTE
If the package is damaged (for example, the package is soaked or deformed, or the seals or pressure
sensitive adhesive tape is unsealed), fill in the Cargo Problems Feedback Form.
Description
Documentation bag that contains a warranty card, and a Quick Start Guide
A pair of guide rails
One rack server
Additional servers are required in a cabinet for capacity expansion.
Copyright © Huawei Technologies Co., Ltd.
Table 3-2
and ensure that they are intact and free from
3 Installing and Removing the 5288 V3
55

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents