About This Chapter
This topic describes the precautions and procedures for installing and removing the 5288 V3.

3.1 Installation Overview

3.2 Installation Environment
3.3 Unpacking the Chassis
3.4 Installing the Server
3.5 Connecting External Cables
3.6 Removing the Server
3.1 Installation Overview
Installation Rules
The 5288 V3 is 4U high and can be installed in a standard 19-inch cabinet. The server can be
installed on L-shaped, adjustable, and holding rails, and is stackable. If the cabinet has
sufficient space, a distance of 1U or more can be reserved between servers.
Installation Process
Understand the entire installation process before installing the 5288 V3.
process for installing the 5288 V3.
Issue 26 (2018-11-19)

Installing and Removing the 5288 V3

NOTE
For details about the safety instructions during the process of installing or replacing a server or its parts,
see "Safety" in the Server Product Documentation.
Copyright © Huawei Technologies Co., Ltd.
3 Installing and Removing the 5288 V3
Figure 3-1
shows the
52