Huawei 5288 V3 V100R003 User Manual page 72

Table of Contents

Advertisement

5288 V3 Server
User Guide
Procedure
Step 1 Install the front end and rear end of the holding rail.
1.
2.
3.
4.
5.
6.
Step 2 Install the server.
1.
Issue 26 (2018-11-19)
Holding down the release latch at the front end of the holding rail, pull out the locking
plate by its hook. See steps (1) and (2) in
Figure 3-11 Installing the front and rear ends of a holding rail
Insert the positioning pins on the rear end of the holding rail into the square holes in the
cabinet. See step (3) in
Align the front end of the holding rail with the hole in the column, and push the holding
rail forward to insert it into the hole in the column. See step (4) in
Push the hook backwards to make the metal sheet in full contact with the column. See
step (5) in
Figure
3-11.
(Optional) Install an M6 screw in the third square hole on the rear end of the holding rail
to secure the rail. See step (6) in
Install the other guide rail on the opposite side using the same method.
Pull out an inner rail from a holding rail until the inner rail cannot move, push the release
button upward, and remove the inner rail from the holding rail. See steps (1) and (2) in
Figure
3-12.
Copyright © Huawei Technologies Co., Ltd.
Figure
Figure
3-11.
Figure
3-11.
3 Installing and Removing the 5288 V3
3-11.
Figure
3-11.
62

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents