FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Dual-Row
Aisle Containment, 208 V)
Figure 3-30 Needle valves
(1) Low-pressure needle
valve
Step 5 Close the rear door.
----End
3.3 Removing Pallets
3.3.1 Unpacking and Checking
Context
Issue 01 (2017-07-30)
To avoid personal injury, three to four persons need to work together when moving a
cabinet.
When moving a cabinet, verify that any open doors do not fall off.
The cabinet with castors can be slid off its pallet using the PDC sliding panel.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
(2) Liquid pipe needle
valve
3 Hardware Installation Preparations
(3) Discharge pipe needle
valve
42