Figure A-21 Securing an adjustable skylight side sealing plate
----End
A.4.5.4 Installing the PC Plate Support and PC Plate
Procedure
Step 1 Select positions for installing PC plate supports. As shown in
should be installed closely to the column, and PC plate support 2 should be installed in the
middle between PC plate support 1 and the edge of the adjustable skylight.
Issue 01 (2017-07-30)
If the space between the right side of the column and the right side of the adjustable skylight is less than
600 mm, PC plate support 2 does not need to be installed.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
A Appendix
Figure
A-22, PC plate support 1
230

Advertisement

Table of Contents
loading

Table of Contents