FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Dual-Row
Aisle Containment, 208 V)
Figure 3-7 Positioning combined bases
Step 7 Check that L1, L2, L3, and L4 meet the following requirements: |L1–L2| ≤ 5 mm and |L3–L4|
≤ 5 mm, as shown in
Figure 3-8 Base layout (unit: mm)
Step 8 Use a marker to mark the hole positions, as shown by (2) in
----End
3.1.1.2.3 Securing Bases
Prerequisites
The positions for installing bases have been determined.
Issue 01 (2017-07-30)
Figure
3-8.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3 Hardware Installation Preparations
Figure
3-7.
23