FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Dual-Row
Aisle Containment, 208 V)
Press down the stop block springs when installing the stop block screws.
Step 3 Install dampers, as shown in
1.
2.
3.
4.
Issue 01 (2017-07-30)
Figure 5-19 Installing the guide rail and glass doors
Slide a damper into the glass door, as shown by (1) in
Snap the damper into the post, and verify that the damper is in close contact with the post,
as shown by (2) and (3) in
Secure the damper to the post using two M4x10 countersunk screws, as shown by (4) in
Figure
5-20.
Install the damper on the other side in the same way.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Figure
5-20.
Figure
5-20.
5 Installing the Contained Aisles
Figure
5-20.
92

Advertisement

Table of Contents
loading

Table of Contents