Huawei FusionModule2000 Installation Manual page 29

Smart modular data center 2000 mmhigh cabinets, dual-row aisle containment, 208 v
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Dual-Row
Aisle Containment, 208 V)
2.
3.
Step 2 Assemble the base, as shown in
Issue 01 (2017-07-30)
Figure 3-2 Measuring the floor height
Adjust the base height to H based on the measured value, as shown by (1) in
Partially tighten the height-locking bolts on two sides, as shown by (2) in
Figure 3-3 Partially tightening the height-locking bolts
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Figure
3-4.
3 Hardware Installation Preparations
Figure
Figure
3-3.
3-3.
20

Advertisement

Table of Contents
loading

Table of Contents