Huawei FusionModule2000 Installation Manual page 70

Smart modular data center 2000 mmhigh cabinets, dual-row aisle containment, 208 v
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Dual-Row
Aisle Containment, 208 V)
Figure 4-5 Placing a cabinet
Figure 4-6 Limitation on front-backward misalignment between end cabinets in two rows
(1) Laser locator
Issue 01 (2017-07-30)
When placing end cabinets, ensure that the front-backward misalignment between end cabinets in
the two rows is within 1.5 mm, as shown in
Use the aisle check tool to check the width between the cabinets in the two rows, as shown in
4-7.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Figure
4-6.
4 Installing Cabinets
Figure
61