8.8.8.6 Installing a Pad

Context
The BOM number of a pad is 01091655. The BOM number of the pad mounting bracket is
21203286.
Procedure
Step 1 (Optional) If the feet in the lower part of the pad mounting bracket are not as wide as the pad,
adjust the feet, as shown in
1.
2.
3.
Figure 8-54 Adjusting the foot
Step 2 Remove the M4 nut, spring washer, and flat washer from the baffle plate on the first cable
hole counting down from the pad mounting kit, and take off the baffle plate, as shown by (1)
in
Figure
Step 3 Remove the nut from the pad mounting bracket and secure the bracket to the pad mounting kit
using the nut, as shown by (2) in
Step 4 Route the pad power cable through the cable hole in the pad mounting kit and connect it to the
pad, as shown by (3) in
Step 5 Adjust the foot in the upper part of the pad mounting bracket and clamp the pad into the
mounting bracket, as shown by (4) in
Issue 01 (2017-07-30)
Figure
Loosen the M4x12 screws on the foot (do not remove it), as shown by (1) in
Adjust the foot symmetrically until it is as wide as the pad, as shown by (2) in
8-54.
Tighten the M4x12 screws on the foot, as shown by (3) in
8-55.
Figure
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
8-54.
Figure
8-55.
8-55.
Figure
8-55.
8 Installing Monitoring Devices
Figure
Figure
Figure
8-54.
8-54.
161

Advertisement

Table of Contents
loading

Table of Contents