FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Dual-Row
Aisle Containment, 208 V)
No.
6
7
8
9
Procedure
Step 1 Install the door frame.
1.
2.
Issue 01 (2017-07-30)
Pull the post side panel upwards off the clips, as shown by (1) and (2) in
Secure the left and right posts to the upper frame mounting kit using six M6x16 screws,
as shown by (3) in
Figure
To facilitate assembly, lay the posts and upper frame mounting kit on the floor.
After the assembly is complete, verify that the posts are flush with the upper frame mounting kit.
Figure 5-16 Assembling a door frame
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Name
Stop blocks at the end of the
guide rail
Dampers
Hanging kits
Door boxes
5-16.
5 Installing the Contained Aisles
Remarks
Limit the position of the
door at both ends of the
guide rail.
The dampers are left and
right sensitive.
The hanging kits are left and
right sensitive.
The door boxes are left,
middle, and right sensitive.
Figure
5-16.
89