Optional) Connecting Pdu2000 Cables - Huawei FusionModule2000 Installation Manual

Smart modular data center 2000 mmhigh cabinets, dual-row aisle containment, 208 v
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Dual-Row
Aisle Containment, 208 V)
Figure A-37 Connecting cables to the industrial connector (five-core cable)
A.7 (Optional) Connecting PDU2000 Cables
Context
If the PDU2000 is not provided with industrial connectors, connect the PDU2000 cables and
lay out the cables on the cabinet top.
Procedure
Step 1 Refer to
Figure A-38–Figure A-41
connections depend on the PDU2000 type and wiring port silk screen.
Issue 01 (2017-07-30)
Figure A-38–Figure A-41
show only the cable connection methods. PDU2000 cable
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
to connect the PDU2000 cables.
A Appendix
243

Advertisement

Table of Contents
loading

Table of Contents