Procedure
Step 1 Remove the four M6 screws from the support to split the adjustable feet from the base, as
shown in
Figure 3-17 Removing adjustable feet
Step 2 Adjust the position of the adjustable feet, adjustable feet moved to 1100mm.
Step 3 Secure the adjustable feet to the base using the four M6 screws removed in
in
Figure
Figure 3-18 Reinstalling the adjustable feet
Issue 01 (2017-07-30)
Figure
3-17.
3-18.