FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Dual-Row
Aisle Containment, 208 V)
Figure 3-39 Securing the tail frame accessories
Step 2 Use four M5 tapping screws to secure one upper sealing plate to the tail frame, as shown in
Figure
There are two upper sealing plates, and the one used in this step has a gap.
the upper sealing plates of a tail frame.
Figure 3-40 Upper sealing plates of a tail frame
Issue 01 (2017-07-30)
3-41.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3 Hardware Installation Preparations
Figure 3-40