Huawei FusionModule2000 Installation Manual page 113

Smart modular data center 2000 mmhigh cabinets, dual-row aisle containment, 208 v
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Dual-Row
Aisle Containment, 208 V)
Step 6 Secure the door box.
If the door box is evenly and properly placed as shown in
screws as shown by (2) in
7.
Figure 5-33 Door boxes in place
Step 7 Adjust the gaps.
After the door boxes are placed, the gaps between the door boxes and the posts may be
uneven and need to be adjusted, as shown in
Issue 01 (2017-07-30)
Figure 5-32 Installing the door box
Figure
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
5-31. If the door box is tilted, adjust it as described in
Figure 5-34
5 Installing the Contained Aisles
Figure
5-33, secure it using M5
and
Figure
5-36.
Step
104

Advertisement

Table of Contents
loading

Table of Contents