Step 8 Raise the four anchor bolts to the highest position using an adjustable wrench, as shown in
Figure
Figure 3-34 Raising the anchor bolts
Step 9 Move the UPS over its castors to the installation position.
----End

3.3.2 Removing the IT Cabinet Pallet

Context
The methods for removing pallets are the same for the network cabinet, battery cabinet, and
IT cabinet. Refer to this section when removing the cabinet pallets.
Procedure
Step 1 Move the cabinet to the planned installation position.
Step 2 Remove the screws that secure the cabinet to the pallet.
Issue 01 (2017-07-30)
Ensure that the sliding plates are properly installed in step (2) in
plates may shift when the UPS is unloaded.
3-34.
When removing the pallet for a 2000 mm high cabinet, adjust the anchor bolts counterclockwise using a
wrench until the cabinet castors come in contact with the floor so that the cabinet can be moved over the
castors.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3 Hardware Installation Preparations
Figure
3-33; otherwise, the sliding
45

Advertisement

Table of Contents
loading

Table of Contents