4.2 Positioning Cabinets (Without Bases)

Prerequisites
The floor levelness meets engineering requirements (levelness tolerance: 3 mm/2000 mm).
Procedure
Step 1 Determine the correct installation position for the smart module based on the onsite
engineering layout diagram.
Step 2 Use a laser locator to mark two lines that are perpendicular to each other in a corner of the
planned installation position.
Step 3 Place one corner of the marking-off template at the crossing point of the perpendicular lines to
determine the position for an end cabinet. Use a marker to mark the outline of the marking-off
template and the mounting holes for the cabinet on the floor.
Issue 01 (2017-07-30)
If no laser locator is available, use a right angle and thin rope for marking the two perpendicular lines.