FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Dual-Row
Aisle Containment, 208 V)
Figure 8-55 Installing a pad
----End
8.8.8.7 Securing the Pad Mounting Kit
Procedure
Step 1 Lay out the cables of monitoring components on the pad mounting kit.
Step 2 Clamp the pad mounting kit to the hanging kit.
Step 3 Secure the pad mounting kit to the hanging kit using two M5x10 tapping screws.