Connecting Cables For The Cooling System; Connecting Cables For The Management System - Huawei FusionModule2000 Installation Manual

Smart modular data center 2000 mmhigh cabinets, dual-row aisle containment, 208 v
Hide thumbs Also See for FusionModule2000:
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Installation Guide (2000 mm High Cabinets, Dual-Row
Aisle Containment, 208 V)

11.11 Connecting Cables for the Cooling System

To connect cables to cooling devices, see the documents delivered with the devices.
11-4
Table 11-4 Reference documents for the cooling system
Device Name
NetCol5000-A 21 kW air
cooled in-row precision
air conditioner (208 V)
NetCol500 outdoor unit

11.12 Connecting Cables for the Management System

See Smart Module Management System Wiring Diagram (The document is delivered with the
device, or you can click Download.).
Issue 01 (2017-07-30)
lists the reference documents.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Reference
NetCol5000-A 21 kW Air Cooled In-row Precision Air
Conditioner Quick Guide (208 V)
The document is delivered with the device, or you can click
Download.
NetCol500 Variable Speed Outdoor Unit User Manual
The document is delivered with the device, or you can click
Download.
11 Cable Routing
Table
208

Advertisement

Table of Contents
loading

Table of Contents