ABB IRBT 4003S Product Manual page 96

Track motion
Table of Contents

Advertisement

Maintenance instructions
Locating blockage in Series-Flo systems
Step 4
1. Install a manual pump into each indicator port of secondary divider valve in turn, and
2. If high pressure exists, blockage has been located.
3. Correct as necessary.
Figure 6 Locating blockage secondary divider valve
Item Description
1
2
3
4
3-14
Action
slowly operate the pump. See
Look for: crushed line, tight bearing, improperly drilled fittings and/or lube inlet
port.
System pump
Master divider valve
Lube outlets
Indicator port, plugs removed
Figure
6.
Item Description
5
Hand pump
6
Secondary divider valve
7
Bearing
3HEA 800 970-001 Rev. D, Mars 2006

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irbt 6003sIrc5M2004

Table of Contents