Siemens Building Technologies
HVAC Products
9. Selecting a temperature or pressure sensor................................... 151
−
2.1.2
Settings for gas-fired operation ................................................................... 152
10. Activating program stops in different program phases ................. 152
−
11. Checking and presetting the actuators positions for gas ignition.. 152
−
12. Manual startup .............................................................................. 152
−
13. Actuator positions during the prepurge time ................................. 153
−
Note:................................................................................................ 153
−
14. Ignition positions ........................................................................... 153
−
15. Setting the curve ........................................................................... 154
−
First setting...................................................................................... 154
−
Changing an existing curve............................................................. 155
−
Creating a new curvepoint .............................................................. 155
−
16. Load limits..................................................................................... 155
−
17. Shutdown ...................................................................................... 155
−
2.1.3
Settings for multistage firing on oil............................................................... 156
18. Fuel changeover for firing on oil ................................................... 156
−
19. Changing the burner operating mode from modulating to multistage
−
(only when firing on oil) ....................................................................... 156
20. Activating the program stops in the different program phases ..... 156
−
21. Checking and presetting the ignition positions for firing on oil ...... 157
−
22. Manual startup .............................................................................. 157
−
23. Actuator positions during the prepurge time ................................. 157
−
Note:................................................................................................ 157
−
24. Ignition positions ........................................................................... 158
−
25. Setting the burner stages.............................................................. 159
−
Example: ......................................................................................... 159
−
26. Shutdown ...................................................................................... 160
−
2.1.4
Extra functions of the LMV5... ..................................................................... 161
27. Valve proving (leakage test LT) .................................................... 161
−
Example 1 (calculation of test time) .................................................... 162
−
Example 2 (determination of the detectable leakage rate) ................. 162
−
2.1.5
Configuration of the load controller.............................................................. 163
Selection of operating mode ............................................................... 163
−
2.1.6
Control parameters of the load controller .................................................... 164
1. Selection of the standard parameter set ......................................... 164
−
2. Individual setting of the PID parameters ......................................... 164
−
3. Automatic adaption ......................................................................... 164
−
Temperature limiter function ............................................................... 165
−
Boiler setpoints W1 and W2 ............................................................... 165
−
2-position controller (C = ON / OFF)................................................... 166
−
Diagram........................................................................................... 166
−
Cold start thermal shock protection (CSTP) ....................................... 166
−
Description ...................................................................................... 166
−
3
Connection terminals / coding of connectors........................................... 168
3.1
Connection terminals of the LMV5... ........................................................... 168
3.2
Coding of connectors................................................................................... 169
AGG5.720 ........................................................................................... 170
−
AGG5.721 ........................................................................................... 171
−
4
Description of the connection terminals................................................. 172
5
Mounting, electrical installation and service .......................................... 177
Basic Documentation LMV51...
9/278
CC1P7550en
01.10.2003