Date And Time; Creating A Micro-Module Plan View; How Can I Add A Ups2000G - Huawei FusionModule500 V100R021C10 User Manual

Smart mini data center
Hide thumbs Also See for FusionModule500 V100R021C10:
Table of Contents

Advertisement

FusionModule500 Smart Mini Data Center
User Manual

5.3.3 Date and Time

Procedure
Step 1 Choose System Settings > System Parameters > Time.
Step 2 Set the time zone, date, and time or click Obtain Local Time, and click Submit.
Step 3 (Optional) If the NTP server is used for time synchronization, select NTP server
sync, set NTP primary server IP, NTP backup server IP, Port number, and Sync
interval (min), and click Submit.
----End

5.3.4 Creating a Micro-module Plan View

Procedure
Step 1 Choose Home > Plan View, create a micro-module in Micro-Module View and
set the layout and device quantity based on the actual micro-module scenario.
Step 2 Drag the icons of registered devices and devices on the cabinet list to appropriate
positions in the layout to create a micro-module plan view.
----End

5.3.5 How Can I Add a UPS2000G?

Prerequisites
One end of the straight-through cable has been connected to the RS485 port on
the UPS2000G, and the other end has been connected to the COM port on the
ECC800-Pro.
Procedure
Step 1 Add a UPS2000G-L.
1.
2.
Table 5-4 Adding a UPS2000G-L
Path
Choose System Settings
> Device Management
and click Add Device.
The parameters for
adding devices are
displayed.
Issue 01 (2020-11-30)
Log in to the ECC800-Pro WebUI as an administrator.
Add a UPS2000G-L.
Copyright © Huawei Technologies Co., Ltd.
Parameter
Device attribute
Device Type
Connect To
5 Power-On Commissioning
Setting
Select UPS from the
drop-down list box.
Select UPS2000G-L from
the drop-down list box.
Select ECC800 from the
drop-down list box.
124