Huawei FusionModule500 V100R021C10 User Manual page 106

Smart mini data center
Hide thumbs Also See for FusionModule500 V100R021C10:
Table of Contents

Advertisement

FusionModule500 Smart Mini Data Center
User Manual
Cable Spacing Requirements
Comply with the following requirements if possible to lay out different types of
cables:
1.
2.
Safety and Reliability Requirements for Routing and Binding Cables
1.
2.
3.
4.
5.
Issue 01 (2020-11-30)
Separate AC and DC power cables from diverse non-shielded signal cables.
Keep the cable spacing greater than 100 mm or use grounded metal for
isolation purposes. Do not bind the cables together. Preferentially route the
cables along different sides of cabinets.
You are advised to route network cables and optical cables separately.
Unless otherwise specified in a design file, ensure that the bend radius (R) of
a cable meets the following requirements:
Common cable: R ≥ 3d
Optical cable: R ≥ 40 mm
NO TE
R indicates the bend radius, and d indicates the cable diameter.
Reserve slack at cable connection positions to facilitate connection and
disconnection and to prevent stress. Do not leave the cables tight and prevent
connector misalignment, as shown in
Figure 4-51 Cable connection positions
Before installing a semi-flexible cable, use a dedicated tool to curve the cable.
Do not curve the cable while holding the cable connector by hand.
If a number of wire terminals are connected to a multi-point connector,
provide slack and arrange them neatly to prevent stress on certain wires, as
shown in
Figure
4-52.
Figure 4-52 Cable connections
Protect cable holes in a metal kit with grommet strips. Alternatively, ensure
that the holes are rounded, free from burrs or sharp edges.
Copyright © Huawei Technologies Co., Ltd.
Figure
4-51.
4 Installation Guide
97

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fusionmodule500-su61a12s

Table of Contents