FusionModule500 Smart Mini Data Center
User Manual
Check Item
Equipment room
height
Equipment room
area
Equipment room
maintenance
clearance
Power system
Water port
If any of the requirements is not met, contact Huawei technical support.

4.1.3 Site Equipment Preparation

Pay attention to the following when unpacking batteries:
● Insert a flat-head screwdriver into the gap between the wooden crate and its
● Be careful to prevent your hands from being hurt by nails during unpacking.
Issue 01 (2020-11-30)
Specifications
≥ 2.6 m
≥ 10.15 m
At least 1200 mm, 1000 mm,
and 1000 mm maintenance
clearance should be reserved
from the front door, rear, and
side of the cabinet, respectively.
At least 100 mm clearance
should be reserved from the
wall.
208–240 V 1Ph 50 Hz/60 Hz
Condensate drain outlet: Drains
condensate water from the
smart cooling product.
NO TE
All cabinets and devices have been delivered to the site and checked against
the delivery list.
Cabinets and devices need to be transported to the specified positions based
on the detailed equipment room layout diagram and unpacked for further
installation.
CA UTION
top cover. Then pry off the top cover along the external edge of the cover until
the cover can be taken out from the crate.
Copyright © Huawei Technologies Co., Ltd.
2
4 Installation Guide
Check Result
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
59