5.2.3 Commissioning the Cooling System

Prerequisites
Check that the smart cooling product is properly powered on.
Before starting the compressor after power-on, ensure that the electric heating
belt of the crankcase has been preheated for more than 12 hours.
Context
High-quality refrigerant R410A is recommended.
Wear antifreeze gloves when performing refrigerant related operations.
The following are the tools used for commissioning and refrigerant charging:
To learn the mapping between the saturation pressure and the saturation
temperature of the R410A refrigerant, see
Table 5-2 Mapping between the saturation pressure and the saturation
temperature for R410A
Saturation
Temperatu
re (°C)
0
1
2
3
4
5
6
Issue 01 (2020-11-30)
NO TICE
CA UTION
Charging tools: pressure gauge (measuring range ≥ 4.0 MPa), rubber hose
(withstand pressure ≥ 4.5 MPa), vacuum pump
Measurement tool: electronic balance
Protective tools: insulation gloves, antifreeze gloves, and insulation shoes.
Other tools: flashlight
Gauge
Pressure
(MPa)
0.7
0.73
0.75
0.78
0.81
0.84
0.87
Copyright © Huawei Technologies Co., Ltd.
Table
5-2.
Saturation
Gauge
Temperatu
Pressure
re (°C)
(MPa)
19
1.31
20
1.35
21
1.39
22
1.4
23
1.47
24
1.51
25
1.56
5 Power-On Commissioning
Saturation
Gauge
Temperatu
Pressure
re (°C)
(MPa)
38
2.21
39
2.27
40
2.33
41
2.39
42
2.45
43
2.51
44
2.57