2 CALCULATION OF SETTINGS
Table 2–10: PROTECTION SETTINGS DATA SHEET (Sheet 5 of 9)
No.
Mnemonic
1002
TL20PICKUP
LINE OVERLD
1101
LIN E O V ER LD
1102
LEVEL1PU
1103
LEVEL2PU
1104
LEVEL1TDLY
1105
LEVEL2TDLY
SCHEME
1201
P IC K SC H E M E
1202
NUMRCVR
1203^
TRIPMODE
1204
CARRSTART
1205
WKINFTRIP
SCHEMETIMERS
1301
TL1PICKUP
1302
TL4PICKUP
TL4DROPOUT
1303
1304
TL5PICKUP
TL5DROPOUT
1305
1306
TL6PICKUP
1307
TL6DROPOUT
1308
TL16PICKUP
1309
T L24D R P P O U T
1310
TL25DRPOUT
1311
TL26PICKUP
Setting value QUAD applies to LPS-D Revision B models only.
Setting is applicable to Revision B models only.
^
Setting is applicable to LPS-D models with three phase tripping only.
GE Power Management
Description
Remote Open Detector Time
Delay
Select Line Overload Protection
Level 1 pickup current
Level 2 pickup current
Level 1 time delay
Level 2 time delay
Select a scheme logic
Select a number of receivers
1-phase / 3-phase Trip Mode
Select Function to use to Start
Carrier in BLOCKing scheme
Select Weak Infeed Tripping for
HYBRID scheme
Trip Integrator
POTT Coord Timer PU
POTT Coord Timer DO
BKR1 b sw Coord Timer PU
BKR1 b sw Coord Timer DO
BKR2 b sw Coord Timer PU
BKR2 b sw Coord Timer DO
Weak Infeed Trip Timer
GDOC Blocking Timer
Distance Blocking Timer
Repeat Delay Timer
LPS-D Line Protection System
2.5 REFERENCE TABLES
Range (5A)
Range (1A)
10 to 100 msec. step 1
NO, YES
2.5 to 20 amps
0.5 to 4.0 amps
step 0.1
step 0.1
5.0 to 40.0 amps
1.0 to 8.0 amps
step 0.1
step 0.1
10 to 200 sec. step 1
10 to 99 sec. step 1
STEPDST, PUTT, POTT1, POTT2,
HYBRID, BLOCK
0, 1, 2
3POLE, 1POLE, 1POLEZ2
DIR, IPB, FD
NO, YES
1 to 200 msec. step 1
0 to 50 msec. step 1
0 to 50 msec. step 1
0 to 200 msec. step 1
0 to 200 msec. step 1
0 to 200 msec. step 1
0 to 200 msec. step 1
8 to 99 msec. step 1
30 to 500 msec. step 1
30 to 500 msec. step 1
0 to 50 msec. step 1
User Setting
2
2-
77