Epson Artisan 810 Service Manual page 245

Color inkjet printer
Hide thumbs Also See for Artisan 810:
Table of Contents

Advertisement

Epson Artisan 810/835/837/710/725/730/Epson Stylus Photo PX810FW/TX810FW/PX820FWD/TX820FWD/PX830FWD/PX710W/TX710W/PX720WD/TX720WD/PX730WD/TX730WD
Application Point
Figure 6-4. Lubrication of the Paper Guide Front Assy
Sub Cassette Slider
Application Point
Figure 6-5. Lubrication of the Sub Cassette Slider
MAINTENANCE
<Lubrication Points>
Seven contact points between the
bushings of the Paper Guide Front
Assy and EJ Roller Shaft/PF
Roller Shaft.
<Type>
G-71
<Application Amount>
φ 1 x sufficient quantity
<Application Timing>
Before installing the Paper Guide
Front Assy
<Remarks>
Apply with brush
<Lubrication Points>
1. Two points at the slits of the
Sub Cassette Slider
2. Two points at the bearings of
the Sub Cassette Slider
<Type>
G-74
<Application Amount>
Sufficient quantity
<Application Timing>
Before installing the Cassette
Assy
<Remarks>
Apply with brush
Overview
Bottom of the EJ Frame Assy
EJ Frame Assy
1
Left of the EJ Frame Assy
EJ Frame Assy
2
Left side
Spur Gear 8.8
3
4
EJ Release Rack
Right side
Spur Gear 8.8
3
4
EJ Release Rack
Application Point
Figure 6-6. Lubrication of the EJ Release Assy L/R and EJ Release Racks
Revision G
<Lubrication Points>
1. Two contact points between
the EJ Frame Assy and the
1
Paper Guide Front Assy
2. Contact point between the left
side of EJ Frame Assy L and
the EJ Release Frame Assy L
3. Spur Gear 8.8 (L/R) (x2)
4. Toothed areas of EJ Release
Rack (L/R) (x2)
<Type>
G-71
<Application Amount>
1. φ 2 x sufficient quantity
2. Sufficient quantity
3. φ 1 x 1 circle
4. φ 1 x toothed areas
<Application Timing>
(1), (2) Before installing the EJ
Frame Assy
(3), (4) Before installing the EJ
Release Frame Assy L/R
<Remarks>
Apply with injector
245
Confidential

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents