ABB REC670 Applications Manual page 527

Relion 670 series, bay control
Hide thumbs Also See for REC670:
Table of Contents

Advertisement

1MRK 511 401-UUS A
Bay control REC670 2.2 ANSI
Application manual
230kV Busbar
300/5
100 MVA
15/0.12kV
P
Q
100 MVA
G
15.65kV
4000/5
ANSI09000041 V1 EN-US
Figure 209:
Single line diagram for generator application
In order to measure the active and reactive power as indicated in figure 209, it is
necessary to do the following:
1.
Set correctly all CT and VT data and phase angle reference channel
PhaseAngleRef (see Section
PCM600 for analog input channels
2.
Connect, in PCM600, measurement function to the generator CT & VT inputs
3.
Set the setting parameters for relevant Measurement function as shown in the
following table:
IED
V
V
,
AB ,
BC
ANSI09000041-1-en.vsd
"Setting of the phase reference
Section 17
Monitoring
channel") using
521

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents