4. Connect the phase conductors to the U2, V2 and W2 terminals. Use a tightening
torque of 0.8 N·m (7 lbf·in).
5. Connect the optional brake resistor to the BRK+ and BRK- terminals with a
shielded cable using the same procedure as for the motor cable in the previous
step.
6. Secure the cables outside the drive mechanically.