Upgrading Software in an Existing Stack
Load new software on the Master (see "Loading New Software to Your Switch" on
1.
page
2. Verify that the software push is complete. Use either the BBI or the ISCLI:
3. Reboot all switches in the stack. Use either the ISCLI or the BBI.
© Copyright Lenovo 2016
Upgrade all stacked switches at the same time. The Master controls the upgrade
process. Use the following procedure to perform a software upgrade for a stacked
system.
82).
The Master pushes the new software image to all Members in the stack, as follows:
If the new software is loaded into image 1, the Master pushes the software into
image 1 on all Members.
If loaded into image 2, the Master pushes the software into image 2 on all
Members.
The software push can take several minutes to complete.
From the BBI, go to Dashboard > Stacking > Push Status and view the Image
Push Status Information, or
From the ISCLI, use following command to verify the software push:
RS G8264(config)# show stack pushstatus
Image 1 transfer status info:
Switch 00:16:60:f9:33:00:
last receive successful
Switch 00:17:ef:c3:fb:00:
not received file not sent or transfer in progress
Image 2 transfer status info:
Switch 00:16:60:f9:33:00:
last receive successful
Switch 00:17:ef:c3:fb:00:
last receive successful
Boot image transfer status info:
Switch 00:16:60:f9:33:00:
last receive successful
Switch 00:17:ef:c3:fb:00:
last receive successful
Config file transfer status info:
Switch 00:16:60:f9:33:00:
last receive successful
Switch 00:17:ef:c3:fb:00:
last receive successful
From the BBI, select Configure > System > Config/Image Control. Click Reboot
Stack.
From the ISCLI, use the following command:
RS G8264(config)# reload
311
Chapter 18: Stacking