Panasonic DVC PRO Studio AJ-D950P Service Manual page 843

Vtr/analog video interface kit
Table of Contents

Advertisement

3-7-7.Supply
and
Replacement
(Removal of Supply and Take-up Reel Unit)
1.
Remove the top panel.
2.
Remove the front loading unit.
3.
Remove the bottom panel.
4.
Remove the connector P34 and P35 on the Mech.
I/F board.
5.
Rotate CW the Red Plastic Screw which is used
for manual tape eject and load the S1 Post to
make the space for screw (C).
6.
Confirm that the S and T brake solenoid iron core
are released.
7.
Push the M Stopper Solenoid to release the M
Stopper.
8.
Remove 4 Screws (C), (D) and (E).
9.
The Reel Table is hooked with inner rail. Slightly
lift the Reel Table so that it does not touch the
brake release arm. Then remove the Reel Table.
Note: Memorize the groove position of Reel Base
which is inserted the pin of Drive Arm Unit. (The
position can remember by the attached grease.)
Take-up
Reel
Unit
(Installation of Supply and Take-up Reel Unit)
1.
Insert the outer rail at the new Reel Table.
2.
Hook the Reel Table Unit at the inner rail. Then
install a Reel Table so that its groove is matched
with the pin of Drive Arm Unit.
3.
Tighten 4 screws (C), (D) and (E) then confirm the
Reel Table moves smoothly on the Rail by hand.
4.
Move the Reel Rotor Unit to front side by hand
and pull up the iron core of M stopper solenoid
5.
Unload completely by rotating the Red Plastic
screw CCW.
6.
Insert the flexible cable into P34 and P35 on the
Mech. I/F board.
7.
Confirm the Main Brake Torque. (Refer to the
Main Brake Torque Confirmation.)
8.
Adjust the Motor Torque Offset. (Refer to the
Motor Torque Offset Adjustment.)
9.
Confirm the Tension Value. (Refer to the Tension
Confirmation.)

Advertisement

Table of Contents
loading

Table of Contents