Space Requirements; Storage Requirements - Huawei FusionCol8000-E24 User Manual

Modular indirect evaporative cooling system
Table of Contents

Advertisement

FusionCol8000-E240 Modular Indirect Evaporative
Cooling System
User Manual

4.1.2 Space Requirements

Install the unit strictly according to the design drawing and reserve space for
maintenance and ventilation.
Figure 4-1 Maintenance space (not combined) (unit: mm)
(1) Wall
Figure 4-2 Maintenance space (combined) (unit: mm)
(1) Wall

4.1.3 Storage Requirements

Before installing the unit, place it in a dry, rainproof, fireproof, and anticorrosive
environment.
Issue 03 (2021-04-20)
If the unit is installed outdoors, ensure that it is free from dirt, rain, snow, or
animal intrusion, and that the protective film on the surface is intact.
Do not expose the unit to strong sunlight in summer. Otherwise, the thermal
insulation panels may be deformed.
Copyright © Huawei Digital Power Technologies Co., Ltd.
4 System Installation (Building Scenario)
(2) Indoor air supply vent
(end)
(2) Indoor air supply vent
(end)
(3) Electric control box
(3) Electric control box
34

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fusioncol8000-e240

Table of Contents