Chapter 6 Power cables connection
Access to terminal blocks on the UPS Power Module
Step 1. Remove the terminal blocks cover (one screw).
Step 2. Punch the knockouts and insert the cables/conduits inside.
Important! High leakage current:
Three phase UPS units, 5594-8PX and 5594-9PX
This section applies to the following Lenovo UPS units:
RT8kVA 6U 3:1 Phase Rack or Tower UPS (380-415V
•
RT11kVA 6U 3:1 Phase Rack or Tower UPS (380-415V
•
Common input sources connection
72
An earth connection is essential before connecting to the power supply!
For additional information see
1. Make sure the jumper is connected.
2. Insert the Normal AC cable through the cable gland.
3. Connect the five cables to the Normal AC source terminal
4. Insert the Output cable through the cable gland.
5. Connect the three cables to the Output terminal blocks.
6. Put back and secure the terminal blocks cover with the
7. Tighten the cable glands.
Leak current information
blocks.
screw.
6U Rack or Tower UPS RT8kVA and RT11kVA IUOMG
in
Chapter 1 1
), 5594-8PX
AC
), 5594-9PX
AC
.